Laserfiche WebLink
<br />S <br />EXHIBIT L <br />RECLAMATION COSTS <br />The reclamation costs are based on unit prices for projects of similaz scope. <br />When Phase 1 is completed, the perimeter of the property will consist of a long narrow trench <br />sloped 3H:1 V and vegetated on the outside and a 1/2H:1 V on the inside. The highwall face <br />created in Phase 2 will get shorter in length as mining progresses north. However it will remain <br />[here until the last phase has been completed. <br />While in Phase 2 Connell will mine from north [o south in strips that progress from west to east. <br />Topsoil and overburden stockpiling will be minimal since they will be backfilling to the edge of <br />the reservoir. As they progress in Phase 2 they will be in vazious stages of mining and <br />reclaiming. This includes stripping, excavating, backfilling, topsoiling and planting vegetation. <br />If Connell defaults during Phase 2 the disturbance in Phase I and 2 will need to be reclaimed. <br />TABLE L-1 SUMMARY OF RECLAMATION COSTS <br />Description Item <br />Cost <br /> <br />Disturbance Cost Total $ 82,820.00 <br />Contractor MOB/DEMOB(8.0%) $ 6,625.60 <br />Overhead (18.5%) $ 15,321.70 <br />Adminstrative(5.0%) S 4,141.00 <br />Total Proposed Bond S 108,908.30 <br />Disturbed Acreage (Acre) 672 <br />Bond Cost Per Acre($/Acre) S 1,621.00 <br />