Laserfiche WebLink
<br /> <br />E. SPECIAL REQIIIREI~ITS (CONTINIIED) <br />1. Materials Containment Plan (Continued) <br />r <br />PA&T I <br />Page 7 of 19 <br />e) Aa implementation schedule for additional facilities which might be <br />required is (c) above, but which are not yet operational; <br />f) A list of available outside contractors, agencies, or other bodies <br />which could be utilized is the event of a spill in order to clean <br />up its effects. If the facility is capable of handling spills <br />ia-house, this shall be documented is the plan; <br />g) Provision for yearly review and updating of the contingency plan, <br />plus resubmission of the play to the Division if conditions and/or <br />procedures at the facility change the original plan. <br />The foregoing provisions shall is no way render inapplicable those <br />requirements imposed by Section 311 of the Water Pollution Control Act <br />Amendments of 1972, regulations promulgated thereunder, the Colorado <br />Water Quality Control Act, sad regulations promulgated thereunder. <br />• This plan should be prepared by a professional engineer registered is <br />the State of Colorado. <br />Nothing herein contained shall be construed as allowing any discharge <br />to waters of the State other than through the discharge points <br />specifically authorized is this permit. Nothing herein contained shall <br />be construed as escusiag any liability the permittee might have, civil <br />or criminal, for any spill. <br />The submittal of an Spill Prevention Control sad Countermeasure Plaa <br />(SPCC Plan) as required by 40 CFR Part 112 may satisfy all or part of <br />this requirement. Should additional materials ezist on site which are <br />not addressed in the SPCC Plan, addressing those materials as per the <br />above w111 be required. <br />C1 <br />Code: 1 - 21 Date: 1 - 84 <br />