My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116454
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:18 PM
Creation date
11/25/2007 2:20:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
5/1/2003
Section_Exhibit Name
Tab 16 Protection of the Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Disturbances to the stream buffer zone in the vicinity of the HRG and Top Soil Pile #RR (TSRRI are <br />limited to a 72-inch culvert that is riprapped and placed in Dry Creek, HRG, TSRR and associated • <br />sediment control structures (berm and sumpl, and two small overland flow conveyance ditches (see <br />Exhibit 13-19.tA1. The TSRR features an earthen berm around the base of the stockpile that conveys <br />runoff and suspended solids to the sump. The surrap is designed to collect all runoff and sediment from <br />the stockpile, preventing contributions of additional suspended sediment to streamflow in Dry Creek. <br />Attachment 13-8 presents the design criteria used in calculating the sump sizes. Topsoil pile RR sump <br />was designed to contain the runoff as the result of the 10-year, 24-hour precipitation event. The <br />minimum storage capacity, as listed on Table 13-8-18, is 1850 cubic feet. Both small conveyance <br />ditches lone on each side of HRG) are designed to adequately convey runoff from HRG without <br />contributing additional suspended solids to Dry Creek. The ditch along the southern edge of HRG <br />discharges to a culvert (Culvert G-1) that is riprapped immediately downstream, providing dissipation of <br />energy from runoff conveyed by this ditch 12.6 pen:ent gradient). The ditch along the northern edge of <br />HRG features a much lower gradient within the stream buffer zone 10.1 percent), so no energy <br />dissipation was necessary at its outlet point. PWCC has placed stream buffer zone signs along the <br />southern edge of the HRG, near Culvert G-i, anai at the western edge of TSRR within the permit <br />boundary to identify the stream buffer zone at this location. <br />Mining disturbances within the stream buffer zone of Sage Creek have been minimized to the extent. <br />practical. One disturbance of the stream buffer zone occurred along Sage Creek near the intersection <br />of the tie-across haul road and County Road 51 B. The disturbance was limited to construction of the <br />toe of the haul road embankment and removal of topsoil prior to the embankment construction. There • <br />was no disturbance of the main channel of Sage Creek. The stream buffer disturbance could not be <br />avoided because the County raised several objections to a proposed haul road alignment that would not <br />have intercepted a portion of the stream buffer area. The associated haul road ditches are properly <br />designed (will convey the runoff from a 10-year, 24-hour storm) to prevent water quality degradation in <br />Sage Creek as a result of the embankment disturbance. <br />Following reclamation grading, salvaged topsoil will be replaced and will be disked to partially tie in <br />with the adjacent undisturbed vegetation. Revegateition methods will follow those described in Tab 22, <br />Revegetation. Seed Mix No. 2, which contains a number of the native species found in the stream <br />buffer disturbance area as well as other <br /> <br />7;a Revision 11/10/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.