My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116411
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:16 PM
Creation date
11/25/2007 2:15:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Permit File
Doc Date
5/16/1973
Doc Name
CERTIFICATE OF SURVEY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT DD ~3 ~ <br />• MINING PLAN <br />The mining method being used is to remove and stockpile the existing <br />topsoil and excavation of the sand and gravel in accordance with Exhibit <br />D. The existing pit is broken up into four areas. Area 1, Mined Out <br />Area (74.1 acres) has already been issued and some reclamation has begun. <br />(See Reclamation Plant, Exhibit FF). Area 2, Present Mining Area (18 <br />acres) is now being mined in benches using loaders and trucks. A conveyor <br />will be utilized to move mined material in early 1981. Area 3, Near <br />Future Mining Area (7.9 acres) will be mined beginning in 4-5 years. <br />Area 4, Distant Future Mining Area (59.4 acres) will be mined beginning <br />in approximately 10-12 years. Annual mining production averages between <br />250,000 - 500,000 tons. Water diversions and impoundments will be listed <br />• in Exhibit G. <br />Time Table <br />Area 1 - Reclamation has begun - it cannot be completed until the entire <br />pit is mined out. <br />Area 2 - Present Mining Area - Estimated Production rate will complete <br />mining in 6-8 years. <br />Area 3 - Near Future Mining - Starts in 5 years - Estimated production <br />rate will complete mining in 12-14 years. <br />Area 4 - Distant Future Mining -starts in 12-14 years and will be compl- <br />eted iii 40-60 years. <br />• Deposit Information <br />Sand and Gravel varies in thickness from 5-75 feet. The material under- <br />lying this deposit is shale. <br />
The URL can be used to link to this page
Your browser does not support the video tag.