Laserfiche WebLink
• <br />• <br />EXHIBIT L <br />RECLAMATION COSTS <br />CONFIDENTIAL <br />Area 1 - Mined out area (1) - 74.1 acres: ' <br />a. Backfilling - material will be pumped from underflow of clarifier - <br />part of mining operation. <br />b. Leveling, grading and topsoiling - 25 days x 8 hrs x 2 units @ <br />$25.00/hour = $10,000.00 <br />c. Se eding - 74.T acres x 23.00/acre for seed = 1,704.30 <br />Labor = 74.1 x $20.00/acre 1,482.00 <br />Mulch = 2 ton/acre x 74.1 acres x 3.00/ton 444.60 <br />Total cost - Area 1 <br />Cost/acre = $183.95 <br />Areas 2, <br />mining p <br />grading, <br />Area 2 - <br />Area 3 - <br />Area 4 - <br />3 and 4 will be benched, <br />rocess. We will use the <br />seeding and mulching for <br />18 acres @ $183.95 = <br />7.9 acres @ $183.95 = <br />59.4 acres @ $183.95 = <br />$3,630.90 <br />$13,630.90 <br />sloped and topsoiled as part of the <br />Figures of $183.95/acre to cover final <br />these areas. <br />3,311.10 <br />1,453.21 <br />10,926.63 <br />** Total reclamation costs areas 1 - 4 <br />$29,321.84 <br /> <br />