Laserfiche WebLink
<br />TABLE OF CONTENTS (Continued) <br /> <br /> <br />Title Vol. No. Page No. <br /> <br />2.06.3 Mountaintop Removal Mining ............... I 2.06-1 <br />2.06.4 Steep Slope Mining ....................... I 2.06-2 <br />2.06.5 Permits Incorporating Variances from <br /> Approximate Original Contour Restoration <br /> Requirements for Steep Slope Mining...... I 2.06-2 <br />2.06.6 Prime Farmlands .......................... I 2.06-2 <br />2.06.7 Variances for Delay in Contemporaneous <br /> Reclamation Requirements in Combined <br /> Surface and Underground Mining Operations I 2.06-2 <br />2.06.8 Surface Coal Mining and Reclamation...... I 2.06-2 <br />2.06.9 Angering ................................. I 2.06-3 <br />2.06.10 Coal Processing Plants and Support <br /> Facilities Not Located Within the Permit <br /> Area ........ .......................... I 2.06-3 <br />2.06.11 In Situ Processing Activities............ I 2.06-3 <br />iii <br />