My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116367
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:14 PM
Creation date
11/25/2007 2:10:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984008
IBM Index Class Name
Permit File
Doc Date
3/15/1984
Doc Name
BARNHART PIT FN M-84-008
From
FOUNTAIN SAND & GRAVEL CO
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2--Michael Stanton <br />With respect to the specific comments and question addressed in <br />enced letter, the following is submitted: <br />1. Exhibit D - Mining Plan <br />A. The permit boundaries and topsoil stockpiles will be <br />prior to mining activity in affected areas. <br />B. Tapaoil stockpiles remaining for more than one <br />will be planted with a perennial grass cover. <br />C. As requested, a 100 foot undisturbed buffer zone will I <br />maintained between the pit and the stream. <br />2. Exhibit E - Reclamation Plan <br />a. The lake portions of the reclaimed area will be avai <br />to wildlife. <br />b. Mulch will be used on 3 to 1 elopes. <br />c. A soils test will be accomplished prior to seeding in <br />to establish fertilizer needs. <br />d. Grazing will be prohibited until vegetation has had an <br />opportunity to establish. <br />refer- <br />season <br />re <br />le <br />e. The area between [he river and the resulting lake is p eaently <br />barren with the exception of some tamarisk. There is 1 the or <br />no topsoil on that portion. The expense of hauling suf icient <br />topsoil and purchasing and planting trees on that area a <br />prohibitive. <br />f. The revised mining plan reflects more irregular shorel~nee. <br />The above addresses all of the issues raised in your letter. If yc <br />further questions or are in need of clarification on any other mats <br />please advise. <br />Sincerely, <br />~~~ <br />General Manager <br />GAM/sew <br />~ have <br />ors, <br />
The URL can be used to link to this page
Your browser does not support the video tag.