Laserfiche WebLink
6. Topsoil considerations -Please see the response to item #3 above. <br />7. Species conservation information -The required species conservation language has been <br />added to the NOI Application. <br />Cost Estimate Considerations - At Oxbow's request, the Division has proposed, in a 6/15/2007 <br />Memorandum from Ms. Janet Binns to Dan Hernandez, a Reclamation Cost Estimate of $43,100. <br />Oxbow fmds this estimate to be overly conservative but acceptable. The Oxbow office located <br />in West Palm Beach, Florida has been directed to provide an acceptable bond instrument to <br />CDRMS as soon as possible. <br />Please contact me at 970-929-5806 if you need additional information. <br />Sincerely, <br />~'. k,~. <br />J es A. Kiger <br />Environmental Manager <br />Enclosures <br />xc: Jim Cooper, OMLLC <br />BLM,UFO <br />USFS, Paonia RD <br />Paonia Public Library <br />Delta County <br />files <br />• Page 2 <br />