Laserfiche WebLink
999 <br /> Deccrber 12, 1979 <br /> l"rs. "n"aret Minter <br /> Flatiron Paving Cornnr7 <br /> P.O. Poz 2?9 <br /> 3ouidn_r, rolorr.Ao F01nr, <br /> TtF: i1el.son Pit - 7/-7n <br /> Dear Mrs. Minter: <br /> 3efore this annlication can be,,Considered adeanate before the 1/23-24, 7.979, <br /> dined Land B.eclarntion Board rPtine the foll.owinp information is nee0ve. <br /> This is i ithout coT^rrrts f.ron ri-e T)ivision of Water nrsources and mir <br /> hydrologist and T •ncer rualit,, r,taff which will he sent to you sc sow as <br /> a reply is 'piven. Please ansver these questionr as quickly as possible, <br /> since I will need time to review it. <br /> 1. Mininp Plan <br /> � <br /> a. Pow nuch for^oil will hr st.•-inrnd and where pill it he gtnrl-- <br /> piled? <br /> b. Will you affect Roulder Creek? <br /> peclamstion Plon <br /> a. flow many ccres will be rrc1^amre per veer? <br /> b. T+Thv don't ynti plant r',ru',e `nd trees also? I recommend wil?cav <br /> and cottonwood at 5 in r. bunch, 20 feet apart along the shore <br /> line. <br /> i <br /> c. How far back to you plan to stsv bade from Boulder Creek, and <br /> Jo you plan to Tluild a beam bet-veen the lakes and Boulder Creek, <br /> and do you plan to rip-Fap it on the outside bank? <br /> d. What effect will the operation have on the downstream adiacent <br /> land comers? <br /> g,. <br />