My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116284
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:09 PM
Creation date
11/25/2007 2:04:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/4/2007
Doc Name
Topsoil Handling South Taylor Area
Section_Exhibit Name
Map 28B -ST
Media Type
M
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND <br />PERMIT BOUNDARY WITH PERMIT REVISION N <br />CURRENT PERMIT BOUNDARY <br />TOPSOIL REMOVAL BOUNDARY <br />PIT SHELL WITH FUTURE PIT MINING LIMITS <br />DISTURBED LANDS AS OF MAR. 2007 <br />-> VIRGIN TOPSOIL REMOVAL TO STOCKPILE <br />4<-- TOPSOIL REPLACEMENT FROM STOCKPILE <br />N:\CCC_ENGOwgsUPermits\South Taylorl0_Pending Edds\28B_032407.dwg. Plotted by Peterson <br />W <br />S <br />E <br />500' 0 500 1000 <br />CONTOUR INTERVAL 25 FT. <br />FLIGHT DATE OCT. 2006 <br />PROFESSIONAL ENGINEERS CERTIFICATION <br />1, THOMAS C. PETERSON, being a <br />Licensed Professional Engineer in <br />the State of Colorado, do hereby <br />certify that this map has been <br />reviewed by me and is true and <br />correct to the best of my knowledge <br />and information relying on engineenng <br />work performed by Marston &Marston, Inc. <br />as well as other information supplied by <br />experts identified in section 2.03.3 of the <br />Co /owyo Coal Company L.P. Permit. <br />.���ooPO0 L �F <br />'•r. PETS%�J'' <br />32257 1 ' = <br />131d1.: <br />/ONet••EaG \```�� <br />M <br />ECA <br />vovvvv <br />vv vovvvv <br />FUTURE <br />TOPSOIL <br />STOCKPILE <br />av vevvv <br />vevvv <br />-> VIRGIN TOPSOIL REMOVAL TO STOCKPILE <br />4<-- TOPSOIL REPLACEMENT FROM STOCKPILE <br />N:\CCC_ENGOwgsUPermits\South Taylorl0_Pending Edds\28B_032407.dwg. Plotted by Peterson <br />W <br />S <br />E <br />500' 0 500 1000 <br />CONTOUR INTERVAL 25 FT. <br />FLIGHT DATE OCT. 2006 <br />PROFESSIONAL ENGINEERS CERTIFICATION <br />1, THOMAS C. PETERSON, being a <br />Licensed Professional Engineer in <br />the State of Colorado, do hereby <br />certify that this map has been <br />reviewed by me and is true and <br />correct to the best of my knowledge <br />and information relying on engineenng <br />work performed by Marston &Marston, Inc. <br />as well as other information supplied by <br />experts identified in section 2.03.3 of the <br />Co /owyo Coal Company L.P. Permit. <br />.���ooPO0 L �F <br />'•r. PETS%�J'' <br />32257 1 ' = <br />131d1.: <br />/ONet••EaG \```�� <br />M <br />ECA <br />
The URL can be used to link to this page
Your browser does not support the video tag.