Laserfiche WebLink
<br /> <br />-3- <br />b) The Board will enter the lands to perfomr reclamation only if the Board has detemtined: <br />that reclamation required by few to have been performed upon such lands has <br />no[ been performed, and <br />ii. that financial warranty forfeiture proceedings described in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/ J~CJ a} Rider is attached. <br />/_~ b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LON <br />Division Director <br /> <br />