• Table 5-1
<br />Mine Topsoil Pile
<br />Topsoil Coordinates Size Approximate Created
<br />Pile ID Location North East (acres) CYDS Date
<br />A78-4 GB well site 410,070 1,417,400 0.5 7,805 pre 1976
<br />A77-1 Afield coal pile 409,850 1,411,300 1.3 12,944 6117
<br />A88-1 North A Haul Roed W of REA Line S 405,450 1,425,100 1.7 80,480 1988
<br />'A91-8 MR-111 Relocate MP8 8 A8 (1991) 410,800 1,421,400 5.1 60,859 1991
<br />'A92-1 NoRh A Road East of East Pyeatt 411,900 1,427,900 12.5 336,429 1992
<br />A92-2 Middle Pyeatt Regrade Spoils 409,800 1,426,000 6.0 179,876 1992
<br />A92-3 North A Road East of West Pyeatt 412,100 1,424,400 0.8 7,632 1992
<br />A93-1 A pit South #1 406,550 1,426,040 3.9 88,454 1993
<br />A93-5 South A pit #5 408,920 1,428,580 4.3 107,468 1993
<br />A93-8 South A pit if6 407,200 1,429,280 4.4 24,088 1993
<br />A94-2 E of Grouse Drainage 412,000 1,429,300 4.4 115,230 1994
<br />A94-4 S of A pit cut 408,500 1,429,600 3.9 165,732 1994
<br />A95-1 South end ofA-PR 407,100 1,413,920 5.1 186,054 1995
<br />A95-2 Oak Pond 410,400 1,433,030 1.1 13,548 1995
<br />A96-1 Mid A Spoil Road 409,800 1,429,450 2.1 52,812 1998
<br />A96-2 NoRh A Pit west ofA 95-2 411,100 1,432,100 3.0 67,480 1998
<br />A97-1 South A PR east side of F4 Road 405,460 1,430,250 2.8 57,172 1997
<br />A97-2 South of LOM Road 408,150 1,429,200 1.5 87,380 1997
<br />A97-3 North end 97A-T!S Laydown 411,200 1,430,230 0.5 15,484 1997
<br />ASH1 Johnson Gulch East TRbutary 408,000 1,421,200 3.9 97,092 1992
<br />ASH2 Johnson Gulch East TRbutary 408,200 1,422,000 1.3 27,488 1992
<br />BUZ92-1 Far East Buzzard Pond #1 411,100 1,410,250 0.4 882 1992
<br />CG1 Coyote Gulch 411,050 1,412,200 4.8 18,309 5/78
<br />D87-1 D pit temp N. 405,500 1,413,100 1.0 7,436 12/87
<br />D92-1 Deer Pond #1 400,700 1,417,850 3.7 23,518 1992
<br />D93-1 North D pit #1 407,725 1,418,160 0.5 20,570 1993
<br />D96-2 Middle D Pit 402,880 1,415,890 4.3 82,608 1996
<br />D96-3 South D Pit 401,180 1,415,820 2.4 31,184 1998
<br />D97-1 North end Enfield Pit 405,640 1,419,440 1.8 29,428 1997
<br />D97-2 South D PR regrade side 401,500 1,416,280 1.0 9,072 1997
<br />DR4 D haulroad #3 Ramp 404,800 1,418,000 0.5 3,500 pre 12/77