Laserfiche WebLink
PART II <br />Page 13 <br />Permit No. COG-850000 • <br />A. MANAGEMENT REQIIIREMENTS <br />3. Noncompliance Notification <br />a) If, for any reason, the permittee does not comply with or will be <br />unable to comply with any maximum discharge limitations or <br />standards specified in this permit, the permittee shall, at a <br />minimum, provide the Water Quality Control Division and EPA with <br />the following information: <br />(i) A description of the discharge and cause of noncompliance; <br />(ii) The period of noncompliance, including exact dates and times <br />and/or the anticipated time when the discharge will return <br />to compliance; and <br />(iii) Steps being taken to reduce, eliminate, sad prevent <br />recurrence of the noncomplying discharge. <br />b) The permittee shall report the following inataacea of noncompliance <br />orally within twenty-four (24) hours from the Lime the permittee <br />becomes aware of the noncompliance, and shall mail to the Division <br />a report within five (5) days after becoming aware of the • <br />noncompliance: <br />(i) Aay instance of noncompliance which may endanger health or <br />the environment; <br />(li) Any unanticipated bypass; <br />(111) Any upset which causes an ezceedance of nay effluent <br />limitation in the permit; <br />(iv) Any spill which causes any effluent limitation to be <br />violated; <br />(v) Daily maximum violations for nay tozic pollutants or <br />hazardous substances limited by PART I-A of this permit and <br />specified as requiting 24 hour notification. <br />c) The permittee shall report alI other instances of non-compliance <br />not requiring 24-hour notification at the time Discharge Monitoring <br />Reports are submitted. The reports shall contain the information <br />listed in nub-paragraph (a) of this section. <br />• ~ <br />