Laserfiche WebLink
PART I <br />Page 11 <br />Permit No. COG-850000 <br />• <br />C. REPORTING REQOIREMENTS <br />4. Recording of Reaulta <br />For each measurement or sample taken pursuant to the requirements of <br />this permit, the permittee shall record the following information: <br />(a) The ezact place, date, and time of sampling; <br />(b) The dates the analyses were performed; <br />(c) The person(s) who performed the sampling; <br />(d) The person(a) who performed the analyses; <br />(e) The analytical techniques or methods used; and <br />(f) The results of all required analyses. <br />5. Calculations for all limitations which require averaging of <br />measurements shall utilize an arithmetic mean unless otherwise <br />specified. <br />6. Additional Monitoring by Permittee <br />If the permittee monitors any pollutant at the location(s) designated <br />herein more frequently than required by this permit, using approved <br />analytical methods as specified above, the results of such monitoring • <br />shall be included in the calculation and reporting of the values <br />required in the Discharge Monitoring Report Form (EPA No. 3320-1), or <br />other forma as required by the Division. Such increased frequency <br />shall also be indicated. <br />7. Records Retention <br />All records and information resulting from the monitoring activities <br />required by this permit including all records of analyses performed sad <br />calibration and maintenance of instrumentation sad recordings from <br />continuous monitoring instrumentation shall be retained for a minimum <br />of three (3) years, or longer if requested bq the Regional <br />'Administrator or the State Aster Quality Control Division. <br />l J <br />