Laserfiche WebLink
PART I <br />Page 7 <br />Permit No. COG-850000 <br />B. EPFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or <br />noncompliance with the effluent limitations specified Sa Part I.B.1, <br />the permittee shall monitor all effluent parameters at the following <br />frequencies. <br />(a) Active Mining <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br />Flow, MGD <br />Total Suspended Solids, mg/1 <br />Total Iron, mg/1 <br />Settleable Solids, ml/1 h/ <br />031 and Grease, mg/1 <br />pH, s.u. <br />Total Dissolved Solids, mg/1 g/* <br />Total Phosphorus (as P), mg/1** <br />(b) Poet-Mining <br />Effluent Parameter <br />Flow, MGD <br />Settleable Solids, ml/1 h/ <br />011 and Grease, mg/1 <br />pH; a.u. <br />Total Dissolved Solids, mg/1 $/* <br />Total Phosphorus (as P), mg/1** <br />Weekly Instantaneous <br /> or Continuous <br />Monthly Grab <br />Monthly Grab <br />Monthly Grab <br />Weekly Visual f/ <br />Weekly Grab <br />Quarterly Grab <br />Quarterly Grab <br />Measurement Prequency d/ Sample Type e/ <br />Monthly Instantaneous <br /> or Continuous <br />Monthly Grab <br />Monthly Visual f/ <br />Monthly Grab <br />Quarterly Grab <br />Quarterly Grab <br />* Total Dissolved Solids monitoring is required only fot discharges to the <br />Colorado River Basin. See specific facility certification rationale to <br />determine whether TDS monitoring is required. <br />** Total phosphorus monitoring is required only for discharges to the Dillon <br />Reservoir drainage area (i.e., Ten Mile Creek, Snake River, Blue River, <br />all tributaries to the Dillon Reservoir). See specific facility <br />certification rationale to determine whether phosphorus monitoring is <br />required. <br />• <br />• <br />See Part I.B.3. for footnotes • <br />