Laserfiche WebLink
<br />-2- <br /> <br />(d) indicate the direction that mineral extraction will proceed; <br />(e) note the location of any significant, valuable, and permanent than-made structures within <br />two hundred (200) feet of the affected area such as houses, barns, fences, above or below ground utilities, <br />irrigation ditches, maintained or public roads, bridges, wells, pipelines, water storage impoundments, <br />railroad tracks, cemeteries, and communication antennas. A narrative description must be provided in <br />Exhibit B -Site Description; and <br />(t) outline and label existing disturbance within and/or adjacent to the permit boundary (e.g., <br />previously mined azeas, roads or excavations resulting from utility cor~truction). Re-disturbance of <br />previously disturbed areas, by the proposed mining operation, must be included in the permit area and <br />addressed in Exhibit D -Reclamation Plan. <br />(3) Reclamation Plan Mao <br />(a) show the gradient of all reclaimed slopes (horizontal:vertical) sufficient to describe the <br />post mine topography; <br />(b) indicate where vegetation will not be established and the grneral area(s) for shrub or tree <br />Planting; , <br />(c) if ponds are a part of the Reclamation Plan, outline the final shore configuration of the <br />ponds and shallow areas ifthe firture land use is for wildlife; <br />(d) state the average thickness of replaced overburden by reclamation area or phase; and <br />Your application will not be coruidered filed until the information listed above is received and found sufiicirnt to <br />begin our review. A decision date will be established 30 days from the date of receipt of all of the requested <br />information Additionally, ifyou have already published notice you will need to republish notice, after the Division <br />considers the application submitted Republication must occur once within ter (10) days of the submittal date. We <br />will notify you whrn you should initiate republication of your notice. The final date for receiving comments is ten <br />(] 0) days after the date of publication or the next regular business day. ~ <br />o mean that there are no other technical deficiencies in your application. The <br />Division will review your application to determine whether it is adequate to meet the requvements of the Act after <br />submittal of all required items. <br />Sincerely, <br />,I <br />Suu E ' rn <br />Progam Assistant <br />Enclosures <br />cc: Mike Splitter, Kiowa County <br />