My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116160
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:03 PM
Creation date
11/25/2007 1:49:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006029
IBM Index Class Name
Permit File
Doc Date
3/24/2006
Doc Name
Inadequate Construction Materials Reclamation Permit Application Package
From
DMG ets
To
Grand County Department of Road & Bridge
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />(e) state the average thiclmess of replaced topsoil by reclamation area or phase. <br />F.XHiRiT G - Sm~rep of i.ea~ghf_ o-F.ntPr nle 63_Te Provide a descripfion of the basis for legal right <br />of entry to the site and to conduct mining and reclamation, for the Owners of Record described in <br />Subparagraph 1.6.2(1)(e)(i). Tlils may be a copy of access lease, deed, abstrect of title, or a current tax receipt. A <br />signed statement by the Landowner and aclmowledged by a Notary Public stating that the Operator/Applicant has <br />legal right to enter and mine is also acceptable. <br />Your application will not be considered filed until the information listed above is received and found sufficient to begin <br />our review. A decision date will be established 30 days from the date of receipt of all of the requested information. <br />Additionally, if you have already published notice you will need to republish notice, after the Division considers the <br />application submitted. Republication must occur once within ten (10) days of the submittal date. We will notify you <br />when you should initiate republication of your notice. The fmal date for receiving comments is ten (10) days after the <br />date of publication or the next regular business day. <br />You have sixty (60) days from the above date to submit all necessary documents that the Office needs for an applicaton <br />to be considered filed. If, at the end of the sixty day period, the application has not been determined to be filed with the <br />Office, the Office shall deny the application and terminate the application file. <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. The Division <br />will review your application to determine whether it is adequate to meet the requirements of the Act after submittal of all <br />required items. <br />Sincerely, C ~~.,~ <br />L~ G °~,~~Za~ <br />Elizabeth Shelton <br />Program Assistant <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.