Laserfiche WebLink
• o Natural drainage patterns will be restored. <br />o Cross drains, dikes and water bars will be constructed as <br />necessary to control erosion. <br />o Any available topsoil will be replaced. <br />o Disturbed areas will be revegetated using the practices <br />described in Section 2.05.4, Reclamation Plan <br />• <br />• <br />4.03-8 <br />