Laserfiche WebLink
Exhibit L <br />Reclamation Costs <br />Reclamation will be conducted jointly with mining of gravel <br />during Phase II and III of the operation in that the final <br />pond surface will be created as gravel is extracted. There <br />will be minimal cost associated with spreading topsoil piles <br />along berm crests and seeding. <br />