My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE116141
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE116141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:12:02 PM
Creation date
11/25/2007 1:48:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Appendix B Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 14 <br />Permit No. COG-850000 <br />•D. GENERAL MONTl'ORING, SAMPLING AND REPORTING REQUII2EMENTS <br />6. Flow Measuring Device <br />If not already a part of the permitted facility, within ninety (90) days afrer the effective date of the permit, a flow _ <br />measuring device shall be installed to give representative values of effluent quantities at the respective dischazge points. <br />Unless specifically exempted or modified by the Division, a flow measuring device wil! be applicable at all designated <br />dischazge points. <br />At the request of the Division, the permittee shall show proof of the accuracy of any flow-measuring device used in <br />obtaining data submitted in the monitoring report. The flow measuring device must indicate values within ten (10) <br />percent of the actual flow being dischazged from the. facility. <br />7. Signatory and Certification Requirements <br />a) All reports and other information required by the Division shall be signed and certified for accuracy by the permittce <br />in accord with the following criteria: <br />i. In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her <br />duly authorized representative, if such representative is responsible for the overall operation of the facility from <br />which the dischazge described in the form originates; <br />ii. In the case of a partnership, by a general partner; <br />iii. In the case of a sole proprie[orship, by the proprietor; <br />iv. In the case of a municipal, state or other public facility, by either a principal executive officer, ranking elected <br />official or other duly authorized employee. <br />• b) All reports required by permits, and other information requested by the Division shall be signed by a person as <br />described above of by a duly audhorized representative of tha[ person. A person is a duly authorized representative <br />only if: <br />i. The audtorization is made in writing by a person described above; <br />ii. The authorization specifies either an individual or a position having responsibility for the overall operation of <br />the regulated facility or activity such as the position of plant manager, operator of a well or a well field, <br />superintendent, position of equivalent responsibility or an individual or position having overall responsibility for <br />environmental matters for the company. (A duly authorized representative may thus be either a named <br />individual or any individual occupying a named position); and, <br />iii. The written authorization is submitted [o the Division. <br />c) If an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information or applications to be signed by <br />an authorized representative, <br />d) The permittee or the duly authorized representative shall make and sign the following certifica[ion on all such <br />documents: <br />"I certify under penalty of ]aw that this document and all attachments were prepazed under my direction or <br />supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the <br />information submitted. Based on my inquiry of the person or persons who manage the system, or those persons <br />directly responsible for gathbring the information, the information submitted is to the best of my knowledge and <br />belief, true, accurate and complete. I am aware drat there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations." <br />r~ <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.