Laserfiche WebLink
PART I <br />Page No. 6 <br />Permit No. COG-850000 <br />• B. EFFLUENT LII4IITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations <br />b. Post-Minine Outfalls (continued) <br />POST-MINING ALTERNATE LIMITATIONS <br />Any dischazge or increase in the volume of a dischazge caused by precipitation within any 24-hour period <br />Greater than the 10-veaz. 24-hour orecioitation event (or snowmelt of equivalent volume) may comply with <br />the following limitations -- subject to burden of proof requirements described in Part I.B.I.d). <br />Parameter ~ Limitation <br />Flow, MGD Report <br />Settleable Solids, mPIP Report <br />pH, s.u. 6.5-9.0 <br />Oil and Grease, mg/P 10 <br />Total Dissolved Solids, mg/P Report <br />CO River Basin ONLY <br />Total Phosphorus (as P), mglP Report <br />Dillon Reservoir and T pper Beaz Creek Drainages ONLY <br />c. General Limitations -Active and Post-Minine Outfalls <br />1) There shall be no dischazge of sanitary wastewaters from toilets or related facilities. <br />2) There shall be no dischazge of floating solids or visible foam in other than trace amounts. <br />3) There shall be no land application of wastewater other than for dust control. <br />4) No chemicals shall be added to the dischazge tmless specific approval is granted by the Division <br />d. Burden of Proof Requirements <br />The permittee has the burden of proof when requesting relief fmm total suspended solids (TSS), total iron <br />and/or settleable solids limitations. Relief shall be granted only when necessary and shall not be granted <br />when the permittee has wntrol over the dischazge. The permit[ee should endeavor to meet the primary <br />limitations whenever possible. The Division shall have final authority in detertnining whether relief is <br />granted. <br />1) For rainfall to waive TSS and total iron limitations, it is necessary to demonstrate that dischazge <br />occurred within 48 hours after measurable precipitation has stopped. To waive settleable solids <br />limitations, it is necessary to prove [hat discharge occurred within 48 hours after precipitation greater <br />than the 10-yeaz, 24-hour event has stopped. <br />2) For snowmelt, to waive TSS and total iron limitations, it is necessary to demonstrate that dischazge <br />occurred within 48 hour's after pond inflow has stopped. To waive settleable solids limitations, it is <br />necessary to prove that dischazge occurred within 48 hours after pond inflow volume greater than the <br />10-yeaz, 24-hour event has stopped. <br />• The Division shall determine the adequacy of proof. As part of this determination, the Division shall <br />evaluate whether the_ permittee could have controlled the dischazge in such a manner that primary limitations <br />could have been met. All manual dewatering of ponds that aze equipped with automatic dewatering systems <br />must meet TSS and total iron limitations. If a pond has only manual dewatering capability, relief is <br />available only to the extent required to regain necessary stability and capacity. <br />See Part I.C. for Definitions <br />