Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DePanment of Natural Resources <br />131 3 Sherman St., Room '?1 5 <br />Denver, Colorado 80?03 <br />Phone: 1303)866-3567 <br />F\%:003) 83? 810ti <br />April 23, 1999 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />R E C L A M A T I O N <br />MINING•SAFETY <br /> Bill Owens <br />Ms. Elizabeth Pacheco eoveroor <br />COShlla COUn[y <br /> <br />352 Main Street <br /> <br />San LUIS, CO 81552 Greg E. Walther <br />Ezecwive Dvector <br /> <br />Michael B. Long <br />Division Director <br />Re: San Acacio Gravel Pit, File No. M-99-024, Receipt of 110 Construction Materials Reclamation <br />Permit Application Package <br />Deaz Ms. Pacheco: <br />On April 21, 1999, the Division of Minerals and Geology received your the 110 Construction Materials <br />Reclamation Permit Apphcation package for the San Acacio Gravel Pit, File No. M-99-024. Preliminary review <br />of the information received determined that the following items must be received before the Division can consider <br />your application as being submitted and technical review can begin: <br />APPLICATION FORM: Page, Item 9: The Quarter/Quarter section needs completing. Page 6. <br />Signature Page: The Notary is for the Applicant/Operator signature only. Please have the notary aze <br />corrected. <br />ADDENDUM 1 -Notice Requirements -Affidavit of PostinE Notice (SiEnl (Rule 1.6.2(11(b)1: The <br />dare the notice was posted is required on this page. Also, the Divisioo requires that original signatures <br />be submitted. <br />Your application will not be considered filed until the information listed above is received and found sufficient to <br />begin our review. A decision date will be established 30 days from the date of receipt of all of the requested <br />information. Additionally, if you have aUeady published notice you will need to republish notice, after the Divisioo <br />considers the application submitted. Republication must occur once within ten (]0) days of the submittal date. <br />We will notify you when you should initiate republication of your notice. The fatal date for receiving comments <br />is ten (10) days after the date of publication or the next regular business day. <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. The <br />Division will review your application to determirte whether it is adequate to meet the requvements of the Act after <br />submittal of all required items. <br />Sincerely, <br />~~'y~ ~/~ <br />Suzi Encksen <br />Program Assistant <br />3Z <br />