Laserfiche WebLink
• <br />CONTRACT SERVICES/CONSUMABLES COST SUMMARY <br />Equipment Removal and Salvage (crusher, conveyors, ventilation <br />for electrical substation, scale) <br />- Hydraulic Crane, 6 hrs @ $65.00/hr ..................... $ 390 <br />- Tractor Trailer, 8 hrs @ $71.50/hr ..................... 570 <br />- Labor, 24 hrs @ $14.60/hr .............................. 350 <br />Sub-Total ......................................... $1,310 <br />Sealing Mine Portals (3 reinforced concrete seals) <br />- Labor, 48 hrs @ $14.60/hr .............................. S 700 <br />- Materials and supplies ................................. 1,550 <br />Sub-Total ......................................... $2,250 <br />Portable building removal and salvage (office and bathhouse <br />trailers) <br />- Tractor Trailer, 3 hrs @ $71.50/h r ..................... $ 210 <br />• Permanent building removal and salvage or demolition (storage <br />shed, scale house, shop building, and foundations) <br />- Hydraulic Crane, 8 hrs @ $65.00/hr ..................... $ 520 <br />- Tractor Trailer, 10 hrs @ $71.50/hr .................... 715 <br />- D-SK Dozer, 2 hrs @ $132.00/hr ......................... 265 <br />- Labor, 65 hrs @ $14.60/hr .............................. 900 <br />Sub-Total ......................................... $2,400 <br />Powerline removal <br />- 1,200' @ $0.90/ft ...................................... $1.080 <br />Consumables <br />- Mulch, 6.17 acres x 2,000 lbs/acre @ $0.05/lb.......... $ 620 <br />2.64 acres x 4,000 lbs/acre @ $0.05/lb.......... 530 <br />Sub-Total ......................................... $1,150 <br />- Seed, 8.81 acres x 27.5 lbs PLS/acre @ $2.14/lb........ $ 520 <br />• <br />-10- <br />