Laserfiche WebLink
iii iiiiiiiiiiiu iii _ <br />Doc Date:12/11/2001 <br />• ~/'r % ~b l b ADDENDUM 10-2 <br /> BASELINE VEGETATION STUDIES - EAST WADGE EXTENSION AREA <br />C 1 <br /> <br />The following baseline vegetation report conducted by ESCO Associates, <br />Inc. covers lands previously referred to as the Seneca II Mine Permit <br />Extension Area and the Cypress Study Area. All references to the <br />Cypress Study Area are the same as the East Wadge Extension Area. The <br />sampling program for this study basically followed the guidelines <br />established by the CMLRD. Final details of the sampling program were <br />negotiated in a series of letters between Peabody Coal Company (PCC) and <br />the CMLRD as follows: <br />May 5, 1987 PCC (Vern Pfannenstiel) to CMLRD (Peter O'Connor) <br />proposing baseline study plan. <br />May 22, 1987 CMLRD (Steve Renner) to PCC (Jim Lunan) concurring <br />with the general sampling plan, but requesting <br />resolution of two concerns. <br />June 11, 1987 PCC (Vern Pfannenstiel) to CMLRD (Steve Renner) <br />resolving CMLRD concerns over the sampling plan. <br />June 23, 1987 CMLRD (Steve Renner) to PCC (Jim Lunan) approving <br />the above baseline sampling program. <br />10-2-1 Revised 06/29/88 <br />