My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115812
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:46 PM
Creation date
11/25/2007 1:23:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I • 3.3.3 East Pane] Landslide Geotechnical Evaluation <br />An East Panel landslide occurred on October 8, 200b. A geotechnical evaluation program <br />has been designed by Agapito Associates. This program is designed to determine the <br />slide plane and to determine pazameters for future development of G and K pit. This <br />program also includes sites in Z dip pit. A description of the sites is shown on Tables <br />3.3-1,3.3-2. <br />Nine holes are scheduled for coring in February -April, 2007. The remaining seven holes <br />will be complefed during the summer 2007 project season. A total of four sites will be <br />completed with inclinometers, five sites with piezometers and all the sites will have <br />surface benchmarks. Surface benchmarks aze used to monitor changes in down-dip <br />displacements over time. Data retrieved from inclinometers is deflection of casing as a <br />function of depth below the collar. Plots aze developed of deflection versus depth. <br />Piezometers will be used to monitor water levels. Planned instrumentation is shown in <br />Table 3.3-3 <br />The monitoring frequency for 2007 will be in accordance with the recommendations of <br />Agapito Associates Inc. and is described as follows: <br />It is recommended that measurements on the benchmazks, inclinometers and piezometers <br />should be made on the following schedule: <br />• • Once per month during the dry season <br />• Once per week during the wet spring (April-May) and fall (September-October). <br />• Once per day after major precipitation (rainstorm) events >0.50 inches for 3-4 <br />days transitioning to weekly for 1-2 weeks and back to a normal schedule <br />thereafter. <br />Depending on monitoring results, Agapito Associates may recommend an increase or <br />decrease in monitoring frequency for certain sites. <br />Trapper wit] report monitoring results to DBMS semiannually in conjunction with the <br />annual report in March and again in September. <br />3-27a Revision: ~ ~ - 9 9 <br />~~ s~a~ ~ `r 2~~1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.