Laserfiche WebLink
• ~ i • <br />• (k) A21 construction will stay at least tnn £eat distance <br />from creeks, lakes or springs and fording of creeks or' ~ <br />• temporary bridges will be at only approved locations. <br />. 5:•'(a), The following heavy equipment will.be used at the work <br />:.-.. <br />,A ~ .+ sites in conduct of the operation: <br />(specify type and size <br />Joy MS4E air track b 1050 Joy compressor <br />I ~~. i; of all oarth moving equipment) <br />• b..(a). The type of work to be done ac the work cites which will <br />• ~'•,'•'~ ~;~ ., ~roault in aurface.raeource disturbance vill be: ' <br />'~ (specify . <br />•• drilling 3" hole for air sampling deposit <br />". "'• +''-~• hand-work, drilling, sempling and testing, excavation.of ,' <br />'. .' cute, pica or trenches, sinking shaft(s), driving adit(a), <br />• ~ ..other) ' <br />~• .. ~'.; I r; ••,~ (b) Work will begin December 1, 1977 and terminate <br />• (approximate date} • <br />March 1, 1977 • <br />, (approximate date} '.., <br />~: <br />' •. 7. (e) • The acres of land which will be disturbed are.eetimeted at <br />~~ ~ spproximately 5 scree. ,' <br />•~• 8.'(a) The planned operat#ona will not include milling or <br />`~ (will or viii not) <br />.' . ' , <br />• procossing operations end wherein such operations will, <br />• require processing oP mineral materials, the type of <br />,~ , .. <br />~. <br />I '. <br />i <br />iI. <br />I <br />I, <br />,a~ <br />x• <br />I process will be j <br />! (gravity, flotation, electro-o~agnetic, <br />C <br />C <br />. leaching, cyanidation, heavy-media separation, etc.} <br />' ~, (b) Approximately none of land viii be required for I <br />I~ ~ ~ • ~ ~: ~ ~ ~ solid vests, and D ,scree wi~I be required for ~ ~ ~ ~ I <br />