Laserfiche WebLink
• <br />-17- <br />Table 7 <br />SUMMARY OF ANNUAL HAY PRODUCTION COSTS <br />• <br /> Irrigated <br /> Acreage Fertil}zer <br />Draw (Ac) Cost <br />Sudduth 40.0 § 280 <br />Williams 61.4 430 <br />Bush 64.9 454 <br />Bolton 70.0 490 <br />TOTALS 236.3 $ 1,654 <br />Length Ditch <br /> of Mainten- <br />Rarvesf~ing Ditch ance3 Total <br />Cost (ft) Cost Cost <br />$ 1,640 18,200 $ 91 $ 2,011 <br />2,517 18,300 92 3,039 <br />2,661 22,400 112 3,227 <br />2,870 21,200 106 3,466 <br />§ 11,743 <br />r1 <br />LJ <br />Notes: 1. §7/AC <br />2. §41/Ac <br />3. §5/1000' Ditch <br />f C1 Leonard Rice Consulting Waler Engineers, Inc <br />$ 9,688 80,100 $ 401 <br />477EFC01 <br />