Laserfiche WebLink
-15- <br />• <br />Table 5 <br />SUMMARY OF UNIT COSTS <br />Item Cost <br />Dam including spillway and outlet $ 3.50/CY <br />Ditches $ 1.00/LF <br />Headgates $ 2500.00 each <br />Road construction $ .50/LF <br />Culverts/crossing structures $ 500.00 <br />• Engineering and contingencies 25% <br />Fertilizer $ 7.00/acre <br />Ditch and Headgate Maintenance $ 5./1000 LF <br />Harvesting $ 41.00/acre <br />• <br />477EFC01 <br />~C1 Leonard Rice Consulting Water Engineers. Inc. <br />