Permit No
M2000034
IBM Index Class Name
Permit File
Doc Date
7/6/2000
Doc Name
ADEQUACY OF THE APPLICATION LOVELAND PIT FN M-2000-034 PROJECT 864-030
From
TST
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXIT D <br />Phase 3 mining will occur on the south half of the outlined mining area (see Exhibit C) <br />on Flatirons Property. This last phase will be mined north to south, after a dewatering <br />trench has been excavated along the perimeter. This water will be pumped into the <br />adjacent pond, or the Big Thompson River as needed. An NPDES permit will be <br />acquired and a sedimentation basin constructed as needed to preserve water quality <br />standards. Sediment trapped in such a basin will be removed periodically and used for <br />reclaim. Stockpiles for Phase 3 will be located in the pit excavated during Phase 2. The <br />concrete batch plant currently on-site will be removed prior to the start of Phase 3. <br />Public sale will continue at the site, and an asphalt batch plant maybe located within the <br />permit area to the west of the actual pit (see Exhibit C). Few improvements will be <br />necessary to provide truck access to the west end of the Flatiron property. <br />Upon completion of Phase 3, after 3-4 years of mining, reclamation of Phases 2 and 3 <br />will commence and be completed within 1-2 years of cessation of mining activities. <br />A summary of the project phasing is as follows: <br />Table D-1. Summary of Phase Disturbance Areas and Schedules <br /> Total <br /> Mined Area Disturbance Operation <br /> Location acres Area Len th ears <br /> Reichert <br />Phase 1 6.22 14.91* 2-3 <br /> ro ert <br /> Flatiron <br />Phase 2 property- 5.94 15.73 3-4 <br /> north end <br /> Flatiron <br />Phase 3 property- 6.28 20.39 3-4 <br /> south end <br />+Flatirons property has existing operations that have no[ been included in this disturbance area, including, <br />but not limited to: concrete batch plant, washout area and existing stockpiles <br />Section 2 - Earthmoving and Onsite Equipment <br />Overburden and topsoil will be stripped and moved by bulldozers, scrapers, front-end <br />loaders and haul trucks. This material will be stockpiled for reclaim and seeded with <br />fast-growing mix to avoid soil erosion if the piles will not be moved for more than one <br />growing season. <br />The same equipment will extract and transport sand and gravel resource. During Phase 1, <br />the resource will be hauled across St. Louis Avenue onto the northeast corner of the <br />Flatiron property. During Phases 2 and 3, resource will be mined, processed and <br />stockpiled on-site. <br />