Laserfiche WebLink
SECTION 3 -TABLE A: SIGNIFICANT MATERIALS, STORAGE METHODS & MANAGEMENT PRACTICES <br />DESCRIPTION OF ON- <br />SIGNIFICANT MATERIAL SITE STORAGE METHODS MANAGEMENT PRACTICES <br /> A B C D E F G H I J K L M <br />To soil stock files X X X X <br />Overburden stock files X X X X <br />Sand and ravel stock files X X <br />Rec clable as halt files <br />Rec clable concrete files X X <br />Salt files <br />Diesel fuel tanks X X X X X <br />Unleaded asoline tanks <br />Lubricatin fluids X X X X <br />As halt story a tanks <br />Cement story a silo X X X X <br />Lime story a silo <br />Concrete additives X X X X <br />As halt additives <br />FI Ash Silo X X X X <br />Cleanin Solvents X X X <br />DESCRIBE MATERIAL LOADING AND ACCESS AREA <br />\J <br />Material is conveyed, placed into hoppers with a loader, or stored in silos and stockpiles. Site entrance, truck loadout area for concrete plant, and <br />areas surrounding shop are paved. Stockpile areas, material processing area and area surrounding aggregate feed to plant are unpaved. <br />