My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115770
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:44 PM
Creation date
11/25/2007 1:18:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989010
IBM Index Class Name
Permit File
Doc Date
1/27/1989
Doc Name
LIMITED IMPACT OPERATION APPLICATION COLO LIEN CO
From
PETE LIEN & SONS INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01i23i89 12:42 <br />• <br />~ 303 490 1063 COLORADO LIEN CO ~ 07 <br />• <br /> <br />544-2 Land Reconstruction <br />specifications guide <br />Site preparation. Areas shall be cleared of trees, logs, brush, rubbish <br />and other undesirable materials. Areas to ba preserved, including those <br />containing vegetation, stream corridors, natural springs or other important <br />features, shall be properly identified. <br />Removal of soil material for use as topsoil. All upper soil horizons to <br />be used in reconstructing ehe soil shall be removed from the immediate Brea <br />before drilling for blasting, mining or any surface disturbance other than <br />removal of woody plants. <br />All the A horizon shall be removed for use as surface coil on disturbed <br />areas. If the A horizon ie less than 6 inches thick, enough material, other <br />than bedrock, immediately below the A horizon can be removed and used to <br />obtain this thickness. If the total thlckneea of the available material <br />is Tess than 6 inches, all unconsolidated material can be used. <br />If increased soil productivity is required for a post-mining use, the <br />s horizon or part of the C horizon or other underlying layers suitable for <br />root. development shall be removed and segregated for use as subsoil. The <br />minimum depth of the Boil and the soil material to be reconstructed shall <br />be 48 inches or be equal to the depth of the subsurface horizon in the natural <br />soil, whichever is less. <br />Removal of overburden material for use as topsoil. Selected overburden <br />material can be substituted for or be added to the material in the A and <br />B horizons if it is demonstrated by field observations and chemical sod <br />physical laboratory analyses that Che overburden matorial or the overburden <br />and topsoil mixture is better suited to use in restoring the capability <br />and productivity of the land than the material originally in the A and 8 <br />horizons. Analyses can include determination of pH value; sullido eontpnr.; <br />percentage of organic material, nitrogen, phosphorus and potassium; texture; <br />and available water capacity. Field-site trials or greenhouse tosts may <br />be neede3 to ascertain the feasibility of using overburden material. <br />if it is determined that the overburden material is suitable, it must <br />be removed, segregated and replaced according to the requirements specified <br />in this stand.+rd. <br />Storage of topsoil material. If it is impractical to spread the topsoil <br />immediately after the land is re-graded, it must be stockpiled. Stockpiles <br />shall be selectively located and protected from wind and water erosion, <br />unnecessary compaction and contamination by undesirable materials. An effec- <br />tive vegetative cover or other suitable practices can provide adequate protection. <br />April 19 :'9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.