Laserfiche WebLink
' SITE DESCRIPTION (cont.) <br />EXHIBIT B-2 <br />MINED LAND 1VILDLIFE QUESTIOIINAIRE <br />' for limited impact and select regular mine applications <br />' <br /> 1. Name of Company/Mine: Sterling Ready-t•;ix Concrete, Harley Pit I <br />' 2. Name/Address/Phone of Contact Person: Lin Taylor, P. O. Box 1149 Sterling, <br /> CO 80751 (303) 522-6500 <br />' 3. Location of Nine: Part of the NW1/4 SE1/4, Sec. 29, T.9 N., R.52 W., 6th <br />' Principal Meridian, Logan County, Colorado. <br /> 4. Nearest Town/General Location: 6.5 mi. North of Sterling, Co. <br />' 5. Land Ownership (Circle) 1. Private 2. BLN 3. USFS 4. Other <br /> 6. Present Land Use: Pasture land <br />' 7. Proposed Final Land Use: Pasture land <br /> 8. Type of Operation: 1. Surface 2. Underground <br /> <br /> 9. Nineral Being Nined: Sand and gravel. <br />' 10. Number and Description of Surface Acres Disturbed by Nining/not including <br /> roads ( Exhibit D- NLRB): 9.98 acres ± <br />' 11. Miles of Road to be Constructed: 0.50 miles all ready in place <br /> 12. Life of Mine: 4 to 6 year ±. <br />1 h <br />i <br /> 13. n along t <br />e <br />Description of Operation and Reclamation: Mining will beg <br /> north line of the property and work to the south. Equipment to be used <br />' will include but is not limited to front end loaders, dozers, dump <br /> trucks and a dragline. Mining will begin by stripping any available <br />' topsoil from a portion of the property and stockpiled along the perimeter <br /> of the mined area. The sand and gravel will then be removed and hauled <br />' to the main plant in Sterling. The deposit of material is between 10 <br /> CONTINOED ON ATTACHED SHEET. <br />' 14. Please inclose Maps of project operation, disturbance area and reclamation <br /> (Exhibit C.) This will expedite processing. Your cooperation is appre- <br /> ciated. <br />' 15. Prepared by: Environment, Inc, Steve O'Brian Date: September 5, 1986 <br />II <br />II e <br />