My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115740
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:42 PM
Creation date
11/25/2007 1:16:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 24 Miscellenous Minor & Technical Revision
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORAOp qH. ti,tgp p. tn~.t., f,ovq~n ~~ <br />• <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, E><ecut;ve Director <br />1~~IINED LAND RECLAIIIA'TI0ri' <br />423 Centennial Builtling, 1373 Sherman Street <br />Denver, Colorado 80203 Tel. (303) B66-3567 <br />David C. Shelton <br />Director <br />September 23, 1982 <br />Mr. William A. Bear <br />Bear Coal Company <br />Sommerset, Colorado 81434 <br />Dear A1r. Bear: <br />The Division has reviewed the minor revision request for backfilIing the <br />Bear No. 2 portal cut with underground development waste from the Aft. <br />Gunnison No. I Aline. The application is deemed complete and the Division <br />approves the minor revision. The approval decision is based on the fact <br />that the material strength characteristics of the Alt. Gunnison No. 1 Mine <br />underground development waste does not vary significantly from the originally <br />anticipated Bear No. 2 Mine backfill. The Division does not consider the <br />revision to constitute a significant change in the reclamation plan. <br />Conformance with stipulations No.8,9, and 10 of permit llo. C-033-81 will <br />continue to be strictly enforced. These stipulations require compaction <br />testing of backfill material prior to placement, and engineering super- <br />vision, inspection, and certification of the placement, compaction and <br />final grading of the backfilled material Following completion of the <br />backfilling, the operator is responsible for the installation and monitoring <br />of slope stability monuments. <br />If you have any questions, please contact me. <br />Sincerely, <br />~~~ ~~~ <br />Dan Mathews <br />Reclamation Specialist <br />DM:ys <br />cc: Floyd Johnson <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.