Laserfiche WebLink
• BEP.R COAL COMPANY, INC. <br />PERMIT MINOR MOCIFICATIOtJ - IJAREHOUSE <br />BONDING COST ESTIt1ATE FOR REMOVAL OF 80' x 100' METAL BUILDING <br />Item <br />Unit Pequired Total <br />Costl Hours2 Cost <br />Hydraulic Crane (6-Ton) <br />D-8K Dozer <br />Front-End Loader (3 yd) <br />Tractor Trailer (drep trailer) <br />• <br />Labor <br />3 6x.40/hr 6.0 5 386.40 <br />193.50 4.0 774.00 <br />98.50 10.0 988.00 <br />71.10 12.0 853.20 <br />16.80 600.0 10,080.00 <br />Subtotal 313,C81.E0 <br />Supervision, Overhead, b Contractor Profit 0 lOp 1,308.16 <br />Total c14,400.00 <br />1 Unit cost includes rental charges, normal operating costs, (both <br />based upon the Cataquest-Rental Rate Blue Book, 1984 Edition) and <br />operator cost (~•~ith benefit surcharge of 40"} <br />2 Required hours are based upon actual experience by Bear Coal <br />• Company in disassembling the building fer transport to the <br />Bear Mo. 3 Mine site <br />