My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115740
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:42 PM
Creation date
11/25/2007 1:16:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 24 Miscellenous Minor & Technical Revision
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~osis~s-szso <br />~ ~ ~ ~N~. <br />ENGINEERING AND ENVIRONMENTAL DIVISION <br />737 LINCOLN AVE. P.U gUSt 13, 1984 <br />P.o. Box n~D~a <br />STEAMBOAT SPRINGS, CO BW77 <br />RECE{VED <br />AUG 151981 <br />Mr. Dan T, Matheo-:s <br />Colorado Mined Land Reclamation Division MINED LAND RECLAMATIONDIVISIOFI <br />423 Centennial Building Calo.Dept.otNaturalResources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Permit Minor Modification-Warehouse Facility <br />Bear Coal Company, Inc. <br />Dear Dan: <br />In response to your expressed concern relative to additional bonding <br />liability for the new warehouse facility at the Bear Coal minesite; I <br />have prepared the enclosed bending cost estimate for disassembly and <br />• removal of the warehouse building. Costs for site rehabilitation and <br />reclamation have previously been included in the Bear Coal Bonding <br />Cost Estimate, so they are not included in this estimate to avoid <br />duplication. <br />As you are aware, Bear Coal currently maintains a bend in the amount <br />of 516,366.97 as surety for reclamation of the Bear Coal Nine No. 1 <br />portal and facilities, the Mine No. 2 portal, and the associated coal <br />handling facilities. 4Jith the acquisition by Anaconda Minerals of a <br />portion of the Bear Coal properties Anaconda has assumed complete <br />financial responsibility, including bond liability, for the Eear Coal <br />Mine No. 1 site and facilities and the coal handling facilities. It <br />is also my understanding that reclamation of the Bear Coal Mine Ne. 2 <br />portal is materially complete. Rased upon this information, it is <br />Bear Coal Company's desire to obtain bond release on the °11,139.50 <br />surety associated with the former Bear properties which are now owned <br />by Anaconda and partial bond release in the amount of $3,136.48 <br />Ig5,227.47 x 0.60) for the backfilling, grading, and topsoil <br />replacement work which has been completed on the Bear No. 2 Mine site. <br />Upon approval of bond release as noted, it is Bear Coal Company's <br />intent to transfer the surety of $14,275.98 to cover the additional <br />bonding liability associated with the warehouse facility. At the time <br />the transfer of surety is effected, Bear Coal Company will make <br />provision for an additional bond amount of $125.00 such that the total <br />bond surety of 314,400.00 is equal to the estimated bond liability <br />• associated with the warehouse facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.