Laserfiche WebLink
r~ <br />s rni c pr coi orxnnn w~~ ~.., ..n i~. , n..rm ~.. ,,..,..... <br />DEP AATMENT Of NATURAL RESOURCES <br />D. Moore Pascoe, Eaeuitlve Dlrenor <br />1V1 LN EU LAN U It L(;LA~1 t1'1'IU <br />423 Centennial Building, 1313 Sherman Street <br />oenver, Colorado eo2o3 Tei. t3o3) 866-3567 <br />David C. Shelton <br />Director <br />January 24, 1983 <br />Mr. Craig Springer <br />Bear Coal Company, Inc. <br />Somerset, Colorado 81434 <br />Dear tor. Springer: <br />The Division has reviewed the minor revision request regarding sediment control <br />at the Bear No. 1 Mine; and has determined it to be complete as of this date. <br />The application states that "construction... will be completed as soon as <br />practical" and requests that implementation of the plan be delayed until the <br />highway department channel relocation project is completed. As we have discussed <br />previously, a specific deadline will have to be established for construction <br />of the ditch and check ponds. It might be possible to delay construction until <br />the highway project is completed, but the status of the project and the projected <br />completion date should be documented. A final decision will be issued by the <br />Division within 10 days. <br />If you have any questions, or further information regarding the river relocation <br />project please let me know. <br />Sincerely, <br />Dan Plathews <br />Reclamation Specialist <br />Dt~1/yt <br />n <br />U <br />