Laserfiche WebLink
RULE 3 PERFORMANCE BOND <br />• RULE 3 -PERFORMANCE BOND <br />The performance bond calculations for the existing permit area aze included in Exhibit 13 of the existing <br />permit document and the reclamation bond costs for the South Taylor mining azea are included in Exhibit <br />13A of this permit revision document. The Bond Calculation Maps showing the Worst Case Topography <br />and Regraded Topography are included as Map 35A and Map 36A, respectively. Bond Calculation Cross <br />Sections are provided on Map 40A. <br />• <br /> <br />South Taylor/Lower Wilson -Rule 3, Page 1 Revision Date: 2/26/07 <br />Revision No.: PR-02 <br />