Laserfiche WebLink
i <br /> <br />• <br />• <br />Cross-Reference (Cont.) <br />2,05 Operation d. Reclamation Plan 0~; ~,~ ~ ~,,,~.,/ <br /> <br />2.05.2 <br />Operation Plan L'de of Operation Lo <br />1 7 <br />132 s <br />3 <br />'~ 12 <br />2.05.3 Operetion Plan Permit Area 1 132 3 13 <br />2.05.4 Reclamation Plan 1 186 5 14 <br />2.05.5 Post Mining Land Use 1 199 5 15 <br />2.05.6 Mitigation of Impacts 1 200 5 16 <br />2.05.6(3) Protection of Hyd. Balance 1 203 5 17 <br />2.05.6(3)(b) Hydrologic Monkoring Plan 1 207a 5 18 <br />2.05.6(3)(b)iii Probable Hydrologic Consequences 1 214 5 19 <br />2.05.6(6) Subsidence Monitoring 1 224 6 20 <br /> <br />2.06 Requirements for Special Categories of Mining <br />2.06.2 Experimental Practices 1 243 6 21 <br />2.06.8 Mining 8 Reclamation Areas, Adj. to <br />Areas, Alluvial Valley Floor 1 243 6 21 <br /> <br />Volume 7 Revision <br />Advance Cameo No.1 into Federal Land 7 Item 1 3 12 <br /> kem 2 <br />Minor Revision Sedimentation Control Plan 7 <br />kem 3 3 13 <br /> kem 4 <br />Technical Revision Access Roads 7 kem 5 3 13 <br />Certification far Sediment Ponds 7 Hem 6 Deleted <br />Northwest Intake Renovation 7 Item 7 3 13 <br />Extension for Item 1 7 kem 8 3 12 <br />Findings Document Reveg. Survey 7 SR71 5 14 <br />Findings Document Monitoring on Rapid S Cottonwood <br />Creek 7 SR4 d~ <br />SR5 5 18 <br />Inspection Response Topsoil Salvage Plan 7 kem 9 2 Appendix <br />9~ <br />Surtace Water Monitoring 7 MR01 5 18; ~ <br />Groundwater Monitoring 7 SRO6 5 / <br /> <br /> <br /> <br />