Laserfiche WebLink
MILBAGS: 60 <br />PROJECT: Haul Road G/Pond 005 DATE: 7/17/92 <br />LOCATION: Seneca IIW Mine, Routt Cty, CO TIME: 2.5 hrs. <br />CLIENT: Peabody Coal HNGR/TBCR: TDF <br />WORK PBRFORMBD: <br />As requested, we visited the project site on this date <br />to conduct nuclear density tests X61 through X63, on the <br />material placed today. <br />The excavation crews placed and compacted oii-site borrow <br />material, obtained from the cuts above Sta. 75+00, in the <br />Haul Road fill between Sta. 51+00 and Sta. 55+00. <br />REMARKS: <br />The material tested generally met project <br />specifications. <br />Please refer to the attached sheet for results of <br />today's testing. <br />VERBAL DISCUSSIONS: <br />Mr. Roy Karo, of Peabody Coal, was notified of today's <br />test results. <br /> <br />REPORT NO.: 23 <br />PROJECT NO.: 92-1100 <br />