Laserfiche WebLink
MILEAGE: E~~ • <br />PP,OJECT: Haul F'oad ~~/P~ end 005 DATE: '/ 14/9 <br />LOCATION: Seneca IIW Mine, F:outt Cty, C^ TIME: ~.5 hrs. <br />CLIENT: Peao~ ~dy C. .al ENGP./TECH: TDF <br />WORK PEP,FORMED: <br />As requested, we visited the prr~.ject site on this date <br />t~~ ~=~~nduct nU~=lear density tests #55 and #57, ..n the <br />material placed today. <br />The excavation crews placed and =ompacted on-site borrow <br />material, obtained from the ~=uts above Sta. ,5+i~l~, in the <br />Haul F.~oad between Sta. 5?+~~~~ and Sta. 61+iiii, <br />Today's .'ill brought the grade up tc~ fini=_h sub-grade in <br />this area. <br />REMARKS: <br />The material tested generally met prn.je~.t • <br />spec i f i~.at i~~ns. <br />Please refer to the attar=hed sheet 1~=~Y 'f 25Lllt5 cif <br />today's `estir~a. <br />VERBAL DISCUSSIONS: <br />Mr. Chug=k McCullOLlgh, _~f F'eab~~dy Coal, was notified ~f <br />today's test results. <br /> <br />I=EPOFT :JO.: ~1 <br />1=~'nJF~T x•10.: . _- L l~?C~ <br />