Laserfiche WebLink
<br />MILEAGE: o~~ <br />PP.OJECT: Haul R~ gad G/P~ end ~!US DATE: %!9/9 <br />LOCATION: Sene~=a IIW Mine, Rc~utt ~t;~, CO TIME: _.S hrs. <br />CLIENT: F'eanody Coal ENGR/TECH: TDF <br />WORK PERFORMED: <br />As requested, we visited the prn.jec+, site ~~n this date <br />to conduc+. nuclear density tests, ;*~i7 *.hrough #45, ~~n the <br />material. <br />The e~<cavation ~_rews placed and :omoacted ~~n-site b~~rrow <br />material. ~_btained fr~~m the ~=uts ab~~ve Sta. T°+~iii, in the <br />read fill from Sta. 5,+i!p to Sta. of+i>i~. <br />REMARKS: <br />The material tested generall./ .net pro.je~.t <br />spec=ificatians. • <br />Please refer t~~ the attar=hed sheet rnr results ~~f <br />today's testing. <br />VERBAL DISCUSSIONS: <br />MY . Chirac k Mri_ul l ough, ~ .f Peabody C,_~al , was nc ~t i f i ed ~_ f <br />t,~day's test results. <br /> <br />'EFOFr .'d0.: .3 <br />