Laserfiche WebLink
MILEAGE: SC? <br />PROJECT: Haul P.aad G/Pond 005 DATE: 7/3/92 <br />LOCATION: Seneca IIW Mine, Routt Cty, CO TIME: '~.~~ hrs. <br />CLIENT: Peabody Coal ENGR/TECH: TDF <br />WORK PERFDRMED: <br />The ercavation ~=rews placed and ~=ompacted on-site borrow <br />material in Haul P.aad "~3" from Sta. 66+pi~ to Sta. 72+n~~. <br />As requested, we visited the project site on this date <br />to ~=onduct nuclear density tests, #4~ through #44, ..n the <br />material . <br />We obtained a sample of material for a chec4;point <br />Proctor determination. The results matched the previous <br />Proctor ~=urve, Sample #1 (li~?O). <br />REMARKS: <br />The material tested generally met project <br />specifications. . <br />Please refer to the attached sheet for results of <br />today's testing. <br />VERBAL DISCUSSIONS: <br />Mr. Chuc4: McCullough, of Peabody Coal, was notified ~~f <br />today's test results. <br />• <br />REPOP..T NO.: 16 <br />PROJECT X10.: 9'~-i 1~~~~ <br />