Laserfiche WebLink
MILEAGE: Sig <br />PROJECT: Haul P.oad G/Pond 0~~5 DATE: 7/1/9?. <br />LOCATION: Seneca IIW Mine, Routt Cty, CO TIME: 1.5 hrs. <br />CLIENT: Peabody Coal ENGR/TECH: TDF <br />WORK PERFORMED: <br />The er,cavatiun crews placed and ~=ompa~_ted Bryn-site borrow <br />material obtained from the cut abr_~ve Sta. 75+i~U, in the Haul <br />Road from Sta. 65+i~~) to 5t a. 7'+i~i~. <br />As requested, we visited the pro.je~.t site on this date <br />to conduct nuclear density tests, #35 through #41, on the <br />fill material. <br />REMARKS: <br />The material tested generally met pro.jer_t <br />sper_ifications. <br />Please refer to the attached sheet fc~r results ref <br />today's testing. <br />VERBAL DISCUSSIONS: <br />Mr. Chuc4: Mct:ullough, of Peabody Coal, was notified of <br />today's test results. <br />~~ <br />LJ <br />REPORT NO.: 15 <br />F'F'OJECT NO.: 9~-1 1 ~?~ ~ <br />