Laserfiche WebLink
• MILEAGE: SO <br />PROJECT: Haul P.oad G/Pond OC15 DATE: 6/9/92 <br />LOCATION: Seneca IIW Mine, P,outt i~ty, CO TIME: ~.~~ hrs. <br />CLIENT: Peabody i~oal ENGR/TECH: TDF <br />WORK PERFORMED: <br />The er,cavation crews placed and ~=compacted on-site borrow <br />material in Haul Road "G" between Stations 4~+p0 to 45+00. <br />As requested, we visited the project site on this date <br />to conduct nuclear density tests, #37 through #38, ~~n the <br />material obtained from the cuts above Sta. 7;,+i~(i. <br />REMARKS: <br />The material tested generally met project <br />specifications. <br />Please refer to the attached sheet for results .,f <br />today's testing. <br />VERBAL DISCUSSIONS: <br />Mr. Chuck McCullough, of Peabody i~oal, was notified of <br />today's test results. <br />• <br />F'EF'ORT NO.: 14 <br />PPOJEC7 NO.: :~-11!0 <br />