Laserfiche WebLink
• <br />MILEAGE: 60 <br />PROJECT: Raul Road C/Pond 005 DATE: 6/26/92 <br />LOCATION: Seneca IIW Mine, Routt ~.ty, CO TIME: 3.0 hrs. <br />CLIENT: Peabody Coal ENGR/TECH: TDF <br />WORK PERFORMED: <br />The excavation crews placed and compacted on-site borrow <br />from the cuts above Sta. 60+00 and placed r.he fill between <br />Sta. 41+50 to Sta. 43+50. <br />As requested, we visited the projer_t site on this date <br />to conduct nuclear density tests, X34 through X36, on the <br />material placed for the Haul Road G fill. <br />REMARKS: <br />The material tested generally met project <br />specifications. <br />Please refer to the attached sheet for results of <br />today's testing. <br />VERBAL DISCUSSIONS: <br />r 1 <br />L_J <br />Mr. Tom Wainwright, of Peabody Coal, was notified of <br />today's test results. <br />REPORT VO.: ~;, <br />inn rf.•n ^• •.in •,•r nn <br />