My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115602
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:35 PM
Creation date
11/25/2007 1:03:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
4/11/2006
Section_Exhibit Name
Tab 13 Attachment 13-10 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• MILEAGE: 61 <br />PROJECT: Haul Road G/Pond 005 DATE: 6/°.4/92 <br />LOCATION: Seneca IIW Mine, Routt Cty, CO TIMfi: 2.5 hrs. <br />CLIENT: Peabody Coal ENGR/TECH: HS <br />WORK PERFORMED: <br />The excavation crews placed and compacted on-site borrow <br />from the cuts between Sta. 46+r)0 and 50+00 and placed it i^ <br />the fills at Sta. ~5+00. <br />As renuested, we visited the project site on this date <br />to conduct nuclear density tests, z:30 through s31, on the <br />material placed for common embankment fill. <br />we obtained a sample of material excavated from the Dam <br />Site far a r,hecl;point Proctor determination. The results did <br />not match the previous Proctor curves, therefore a full <br />Proctor has been performed. This sample will he referred to <br />• as Sample :1 for .lob No. 91-1100A. <br />In addition, we observed the Dam Site for Pond 005. The <br />site had been cleared of top soil and vegetation and crews <br />were cutting into the natural soils for the Ivey way. The <br />natural soils underneath the proposed fill were also being <br />rer_ompacted with a CAT 815. One area of soft, saturated <br />natural soils was noted by the operator's near the downstream <br />toe of the fill. We recommended that this area be stabilized <br />prior to fill plar_ement. <br />REMARKS: <br />The material tested generally met project <br />specifications. <br />Please refer to the attached sheet for results of <br />today's testing. <br />VERBAL DISCUSSIONS: <br /> ?1r. Tom Wainw right and ?1r. Chuck McCulloh, of Peabody <br /> <br />• Coal, were notified of today 's test results. <br />REPgR'P V0. : I1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.