Laserfiche WebLink
s <br />MILEAGE: 6:3 <br />PROJECT: Haul Road GiPond 005 DATE: 6j23%92 <br />LOCATION: Seneca IIW Mine, Routt Cty, CO TIME: 2.5 hrs. <br />CLIENT: Peabody Coal ENGR/TECH: HS <br />WORK PERFORMED: <br />The excavation crew placed and compacted on-site borrow <br />from the ~:uts between Sta. 47+00 to 52+00 and placed the <br />material in the fill between Sta. 43+00 and 45+00. <br />As requested, we visited the project site nn this date <br />to conduct. nuclear density tests, R27 through x29, on the <br />material placed for common embankment fill. <br />REMARKS: <br />The material tested generally met. project <br />• specifications although, the material from the cut is <br />becoming progressively rocky as the cut is advanced. The <br />presence of excessive rock within the fill may produce <br />erratic field density test resu7.ts and may prohibit accurate <br />field test results. foe will monitor this situation and Keep <br />you informed as required. <br />Please refer to the attached sheet for results of <br />today's testing. <br /> <br />VERBAL DISCUSSIONS: <br />Mr. Tom Wainwright. and Mr. Chuck Mc0ulloh, of Peabody <br />Coal, were notified of today's test results and observations <br />of the mot.erial being excavated from the cuts, <br />REPOIi'f V0. : l0 <br />