Laserfiche WebLink
• <br />MILEAGE: 62 <br />PROJECT: Haul Road G/Pond 005 DATE: 6/18/92 <br />LOCATION: Seneca IIS9 Mine, Routt County, COTIMfi: 3.0 <br />CLIENT: Peabody Coal ENGR/TECH: HS <br />WORK PERFORMED: <br />The excavation crews placed and compacted on-site borrow <br />material from the ruts between Sta. 48+00 and Sta. 52+00 <br />and placed the material in the fill at. Sta. 45+00. <br />As requested, we visited the project site on this date <br />to conduct nuclear density tests, x22 through X24, on the <br />material placed for common embankment fill. <br />We obtained a sample of material, Sample #3, from the <br />fill at Sta. 45+00 being used for common embankment fill and <br />delivered it to our laboratory for moisture density <br />relationship determination. The test results will he <br />forwarded upon completion. <br />REMARKS: <br />The material tested generally did not meet project <br />specifications. <br />Please refr_r to tlxe attached sheet for results of <br />today's testing. <br />• <br />VERBAL DISCUSSIONS: <br />Mr. Cixuck McCulloh, of Peabody Coal, was notified of <br />today's test results. <br />REPOVt'C V0.: 8 <br />