My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE115564
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE115564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:11:33 PM
Creation date
11/25/2007 1:01:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Permit File
Doc Date
10/10/2003
Doc Name
II West Coal Refuse Facility Designs (Aug 2003)
Section_Exhibit Name
Exhibit 2.05-E4 Part 8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I • Refuse Pile Construction and Maintenance <br />General coal refuse facility construction and operation practices will include the following <br />activities: <br />1) Establish upgradient clean-water diversion(s) to intercept and route undisturbed <br />drainage azound the refuse pile azea <br />2) Construct perimeter collection ditch(s) and sedimentation control structure(s) or <br />alternative sediment controls, as required to collect and control disturbed azea <br />drainage and sediment from the refuse pile azea <br />3) Establish road access to and in the refuse pile area <br />4) Cleaz and grub lazge vegetation and strip available soil material and remaining <br />vegetation from the initial pile footprint azea <br />5) Construct initial section of underdrain using rock or select granulaz material and <br />appropriate filter fabric <br />6) Selectively place and compact coal mine refuse materials in successive <br />' • horizontal lifts (maximum 2-foot thick, compacted to 90 percent of maximum <br />dry density) consistent with design specifications <br />7) Progressively expand the pile from the toe upward by repeating steps 1 through 6 <br />as each bench is completed to it's design elevation <br />8) Grade bench outslope and surface to final configuration (maximum 2H:1 V <br />slopes) <br />9) Place a minimum of 4 feet of suitable (non-toxic, non-combustible) cover <br />material on the regraded surfaces and seed to establish permanent vegetation <br />The coal refuse facility construction will be supervised and monitored by a qualified Registered <br />Professional Engineer. Inspections of refuse fill construction activities will occur on a quarterly <br />basis, at a minimum, and will specifically include inspections during the critical construction <br />activities of; 1) Foundation preparation; 2) Underdrain construction; 3) Surface drainage <br />construction; 4) Refuse fill placement and compaction; and 5) Cover material placement and <br />revegetation. The inspecting engineer will provide a certified report to the CDMG within 2 <br />weeks following each inspection documenting construction in compliance with the design <br />specifications. Inspection reports will identify and describe any observed instability or <br />potentially hazazdous conditions and will include photographic documentation of construction <br />activities. Copies of the inspection reports will be retained onsite for future reference and <br />• review. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.