Laserfiche WebLink
~~~~~• . ti~Yti~4~titi~ti <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - SCRAPER WORK <br />------------------------------ <br />------------------------------ <br />TASK N0. 3 PREP. BY: WCY PERMIT NO. M-77-522 <br />DATE 04/20/94 FILENAME: M522-3 OPERATION: Feit Pit <br />PERMIT ACTION Bond Calculation <br />TASK DESCRIPTION Spread 8,000 cu.yd. topsoil <br />HOURLY EQUIPMENT COSTS: <br />Single, Double or Triple i <br />County: WELD Labor Zone 1 Shifts S <br />Equipment Descriptions <br />Scraper team make-up :CAT 631D with ROPS cab <br />' Road maint. - Grader :CAT 12G with ROPS cab <br />- Water T. :N/A <br />Scraper Team Road Maintenance <br />Scraper Dozers) Grader Water truck <br />Equipment Filename:631D-ROP 12G--ROP N/A <br />Utilization on job: 100% N/A 20% N/.4 <br />Cost Breakdown: <br />Ownership cost/hr: $43.33 N/A $18.06 N/A <br />Operating cost/hr: $77.35 N/A $2.88 N/A <br />Operator cost/hr: <br />- $20.56 <br />- <br />-- <br />-- N/A <br />-- <br />-- $20.56 <br />- <br />- <br />- N/A <br />-- <br />-- <br />- <br />Unit subtotals: - <br />- <br />$141.24 -- <br />-- <br />N/A -- <br />--- <br />- <br />$41.50 - <br />-- <br />-- <br />N/A <br />Scraper team subtotal $141.24 Maint. subtotal $41.50 <br />Total Work Team Cost/Hr:4 4$182474M1 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 8000 CCY <br />Cu.Yd. " " " " " Swell Loose <br />Volume: 8,000 CCY Factor: 1.215 Volume: 9,720 LCY <br />Source of quantity take-off:na <br />Source of est. swell factor:b <br />